The project
The new oil/air cooler system was to be used by a location of the largest producer of steel in the world.
Our approach
Hydrauvision designed a skid with five oil/air coolers installed in parallel. The coolers are connected through stainless steel pipework (MIP). They are realised by Hydrauvision Piping. The required fittings are also provided in the pipework such as check valves, a safety valve and bellow-seal compensators. Hydrauvision proved its additional value because of the intensive collaboration between Systems and Piping. This means that we could present an innovative design and further develop and build it quickly.